Cannon Green, London

Execution Period: 2015 - 2017


Scope of Works

  • Glass facades on the pavilion with 6 meter high tarpaulins and curved insulated glazing
  • Bespoke door construction
  • Cannon green [EN]
  • Cannon green [EN]
  • Cannon green [EN]
  • Cannon green [EN]