DE EN
  • Voltair Office, Berlin
  • Voltair Office, Berlin
  • Voltair Office, Berlin
  • Voltair Office, Berlin

Voltair Office, Berlin

Execution period: 2019 - 2023


Scope of Works:

Complete building skin of the 8 storey building, incorporating:

  • Ground floor facades to the street elevations and the courtyard designed as thermally broken double glazed aluminium post transom system including entrance door systems and escape doors
  • Main entrance areas with automatic sliding doors
  • Unitised facades to the street elevations and the courtyard designed as thermally broken special double glazed aluminium construction
  • Glass boxes to the street elevations designed as a special construction comprising steel support structure, aluminium framework and silicone structural bonded glazing without mechanical fixing
  • Sun protection and antiglare devices
  • Roof sealing and coverings

 

Architect

J. MAYER H. und Partner


Client

Volt Berlin GmbH & Co. KG